Use Cases · Risk & Review Coverage
Know your blind spots, and where you still carry risk.
A scheme carries thousands of requirements, and no team reviews every one by hand. Tektome reports what was reviewed, what was not, the confidence behind each answer and the source it traces to, updating as the design moves. The record stands for the thirty years a claim can take to arrive.
Current practice
Two sentences a claim will separate, years after anyone said them.
"We did not look." A requirement existed, it was never captured, and so nothing was ever reviewed against it. It was not missed by a reviewer; it was never put in front of one.
"We thought we looked." The requirement was known, the package was reviewed, and the two never quite met. The report came back clean because the report only speaks about what it opened.
- Coverage is invisible, so an unexamined requirement and a satisfied one read identically at sign-off
- Depth depends on who had hours that week, not on what the scheme needed
- Nothing produced along the way survives as evidence once the question is asked years later
Review report · revision C
With Tektome
The register comes first. Coverage follows from it.
Tektome builds and maintains the full set of requirements that define quality on the scheme, from statutory duty through to company standard, and reviews the package against all of them on every issue. The output is not a list of findings. It is a position you can put in front of a client, an insurer or a regulator: for every requirement, where the scheme stands, and where it does not yet stand up.
Review streams
- All requirements3,400
- Compliance and code1,280
- Coordination960
- Submittals and QA1,160
Status
- Met1,610
- Not met618
- Not yet reviewable476
- Never reviewed696
Sources
- Regulations612
- Client requirements538
- Company standards486
- Technical guidance374
- Consultant requirements329
- MIDP / TIDP287
- BEP / data assurance241
- Tender evaluations198
- Contract requirements184
- Meeting notes and email151
- Reviewed and met
- Reviewed, not met
- Not yet reviewable
- Nothing has been reviewed against it
94
Critical, resolve now
2,228
Reviewed to date
618
Open issues
94 high271 med253 low
124
No owner assigned
Minimum height of horizontal DPC in external wall, 150mmApproved Document C, 5.5(b)Critical
?Unassigned Never reviewedCompartment line at the plant deckApproved Document B, 8.2Critical
?Unassigned Never reviewedParty wall acoustic rating, ≥ 45 dBClient BriefCritical
MKM. Kaur Not metPower socket in the wheelchair storageApproved Document M Vol 1, 3.25(c)High
ATA. Toft Not yet reviewable3,396 more requirements in this view
1 – 4 of 3,400Minimum height of horizontal DPC in external wall, 150mmApproved Document C, 5.5(b) · critical
No record of any review against this requirement, on any revision. The DPC height is neither a finding nor a pass. Nothing has been looked at.
CoverageRevision C
1,610
Met
618
Not met
476
Not yet reviewable
696
Never reviewed
Company standard, section 12
Indexed 4 Mar · 214 requirements drawn
What you get
The outputs and the evidence.
A managed requirement register
The full set of requirements the scheme has to satisfy, structured, sourced and kept current as the project moves. Risk can only be identified against something.
IncludingStatutory duty, approved documents, Employer’s Requirements, the client brief, company standards, and the commitments made in minutes and correspondence.
Sources
- All3,400
- Regulations612
- Client reqs538
- Company stds486
- Technical guidance374
- Consultant reqs329
- MIDP / TIDP287
- BEP / data assurance241
- Tender evaluations198
- Contract requirements184
- Meeting notes and email151
Fire escape route clear widthApproved Document B Vol 1
MetParty wall acoustic rating, ≥ 45 dBClient Brief
Not metHorizontal DPC height, 150mmApproved Document C
Never reviewedPower socket in the wheelchair storageApproved Document M
Not yet reviewable3,396 more in this view
1 – 4 of 3,400The coverage statement
For every requirement: has it been reviewed, what is the status, how much rests on it, and where a review could not be done, what is missing and why.
AnswersMet, not met, not yet reviewable, or never reviewed, with what is missing named in the cases where a review could not be completed.
One requirement, fully stated
Fire rating of flat entrance doors, ≥ FD 30 S
- Status
- Met
- Confidence
- 96%
- Importance
- Critical
Blind spots as an output
The requirements nothing has been reviewed against, surfaced as a ranked list before sign-off rather than discovered afterwards. A rule-based tool stays silent where it holds no rule.
Ranked byWhat rests on the requirement, so the critical unexamined item is not sitting below forty trivial ones.
Nothing reviewed against · ranked
- 01Window opening aligned with brickwork dimensionsCritical
- 02Wall insulation thicknessCritical
- 03Flat entrance door clear widthCritical
- 04Built-in storage areaHigh
- 05Door nib dimensionHigh
One consolidated risk position
Compliance and code review, coordination and interface review, submittals and QA/QC each produce their own findings. Held separately, none of them tells you where the scheme stands. Tektome pulls them into a single position rather than siloing them per review type.
Why it mattersRisk that sits between two review types is the risk nobody owns. A consolidated view is the only place it becomes visible.
Review streams · revision C
Portfolio roll-up
The same coverage view aggregated across every live scheme, so exposure is visible at organisation level rather than one project at a time. Single-project coverage is the unit; portfolio oversight is the aim.
Why it mattersAn issue that repeats across three schemes is a systemic one. Seen one project at a time, it looks like three unrelated problems.
Coverage across live schemes
Northgate Phase 2Ravensmoor · Rev C · 3 critical to review
Cornbrook YardAlderhithe · Rev F · 1 critical to review
Halden StreetMarchwell · Rev B · 7 critical to review
12 live schemes · 3 shown
Traceability and audit trail
Every requirement linked to its source, and every review, decision and sign-off recorded: who examined what, when, why it was accepted, and what was left to human judgement.
Holds forAs long as the liability lasts, not as long as the project team stays together.
Audit trail · REQ-118
Requirement captured
Company standard §12 · 4 MarReviewed against revision B
Model and 6 sheets · 19 JunConfidence too low to settle
Referred to the building fabric consultant · 2 AugAccepted, with a condition recorded
A. Rowe, building fabric consultant · 8 Aug
Interrogate it, and issue it
The coverage picture is not locked inside a dashboard somebody has to be trained on. Ask a question about the scheme in plain language and get an answer with its source attached. Then ask for the output you actually have to issue, and it is built from the same live position rather than re-exported by hand.
IncludingCoverage reports, design team meeting packs, dashboards and presentations, generated from your own templates and staying linked to the current position rather than freezing on the day they were made.
Which critical requirements have nothing reviewed against them?
Ninety-four, on revision C. Sixty sit with the fire strategy, twenty with acoustics, fourteen with the facade. The oldest has been open since revision A.
Build the coverage report for Thursday's design team meeting.
Coverage across every format
A requirement is rarely satisfied in one place. It is drawn on a sheet, dimensioned in a model, described in a specification, quantified in a schedule and agreed in a set of minutes. Review one format and you have reviewed one account of it. Tektome reads them together, and against each other.
Why it mattersConfine a review to the model, or to the drawing set, and everything outside it is unexamined and reads as clean. This is what separates a complete coverage picture from a partial one.
Read, and reviewed against each other
3D
- IFC and native BIM models
- Federated coordination models
- Point clouds and scans
2D
- PDF and issued drawing sets
- DXF and CAD drawings
- Scans, markups and handwriting
Documents
- Specifications and reports
- Employer's Requirements
- Standards and approved documents
The messy sources
- Meeting minutes and notes
- Email and correspondence
- Schedules and equipment lists
Value
What the work produces, what it prevents, and what that is worth.
What it looks like when coverage fails
-
Specified
Intumescent seals behind every switch and socket -
Missed
Roughly two thousand of them, on one scheme -
Surfaced
At handover, once the work was already closed up -
Paid for
Delay, liquidated damages, and scaffolding and plant standing on site
The cost was never the seals, and nobody had decided to skip the requirement. It was assumed, but never verified.
10%
of project value lost to avoidable error, most of it traced to inadequate planning
CITB / GIRI Productivity Commission, April 2026 · measured across 25 live UK projects worth £942.5m
45%
of projects affected by design errors and late information, the single largest causal cluster
HKA CRUX, 6th annual report, October 2023 · the design share has declined since
60%
of building defects could have been prevented by better design, so the cheapest place to catch them is upstream
Chong & Low, Journal of Performance of Constructed Facilities, 20(3), 2006 · a nine-month condition survey of 74 buildings
Why Tektome
A tool reports on what it examined. A signature covers the whole scheme.
Rule-based tools return findings on what they examined. They hold no register of what the scheme was supposed to satisfy, so the absence of a finding carries no information. Insurer proposal forms now ask by name about milestone reviews and design gateways, and a reasonable-steps defence is only as good as the record behind it. This is the one output a rule-based tool cannot produce, and it is the one whoever signs actually needs.
| On this | A rule-based tool | |
|---|---|---|
| What it holds | Encoded rules, not the requirements this scheme committed to | The register, including the requirements that live in briefs and correspondence |
| The unexamined | Silent where no rule exists, which reads identically to a clean result | Named explicitly, ranked by what rests on it |
| Coverage | Cannot say what share of the scheme it covered | A position you can hand to a client, an insurer or a regulator |
| Formats read | Either the drawings or the text, so the half it cannot open goes unchecked | 3D models, 2D drawings and documents together, and against each other |
| What it leaves | Findings, not a record that survives the project team | A defensible record, and adds to one only your firm holds |
Who this is relevant to
The duty sits with the firm. The exposure lands on named professionals.
A Principal Designer duty runs for as long as the liability does, and it is answered by whoever can produce the record. That exposure is not shared evenly. It falls first on the people who carry the firm's obligations, and only then on the people who design and build the work.
Legal and governance
General Counsel · Company SecretaryManaging Partner, Practice Director or Finance Director at design practices
A process you can show
Evidence that reasonable steps were taken, held for as long as the duty lasts, rather than a recollection defended years later.
Insurance and risk
Whoever owns the PI programmeThe title varies by firm; the renewal obligation does not
The evidence renewal asks for
Proposal forms ask what the design review process is. This produces the documented answer as a by-product of the work, not as a write-up before submission.
Design leadership
Technical Director · Head of Design ManagementHead of Technical Excellence
Judgement that scales
Your best reviewer's reading applied to every package rather than the ones there were hours for, and kept in the firm after they leave.
Client and development
Development DirectorClient side
Due diligence before you submit
See what would turn a submission back while it can still be fixed, so validation is not where you find out.
In the project team
Engineer · Architect · BIM coordinator. Answers about their own project in the tools they already use, with nothing extra to maintain for someone else's audit trail.
Next step
Interested to learn more?
A 30-minute session: a deeper look at the platform, and a conversation about the schemes and duties your firm is carrying. Nothing to set up, no project data needed.
- The review running end to end, on a real scheme
- A walkthrough on a project we have prepared
- Live Q&A with our engineering team
Book a 30-minute intro
Your request is in.
We'll be in touch shortly to find a time that works.