Long enough to answer a claim, which can arrive decades after the project team has dispersed. A Principal Designer or Principal Contractor duty runs for as long as the liability does, and it is answered by whoever can produce the record. Tektome links every requirement to its source and every decision to the person who took it, and holds that for as long as the duty lasts.

See how Tektome handles this in Risk & Review Coverage