Requirements Management

Every requirement, in one place.

Tektome integrates meeting minutes, regulations, internal standards, and institutional know-how, automatically tracking and distilling what designers need to act on.

Core Concept

One system that centralizes every constraint, requirement, and piece of knowledge — and flows it seamlessly through to BIM verification.

Core Concept

A single source of truth that centralizes all constraints, requirements, and knowledge — and flows them seamlessly through to BIM verification.

Core Concept

Centralize every constraint, requirement, and insight in one place — and carry it, intact, all the way through to BIM verification.

Core Concept

One system that centralizes every constraint, requirement, and piece of knowledge.

Inputs

Constraints Requirements Knowledge

One source of truth

Tektome centralizes every constraint, requirement, and piece of knowledge.

Outputs

Checklists BIM Verification Drawing Checks

Core Concept

Centralize every constraint, requirement, and insight in one place — and carry it, intact, all the way through.

The Four Resources

Everything that shapes what must be followed.

The solution integrates four structurally different sources of constraint — each with its own update frequency, authority, and handling logic.

R1

Meeting Minutes

Client dialogue and accumulated change history. Natural language, high change frequency, traceable through LLM extraction to structured requirement records.

High frequency
R2

Regulations

Building Standards Law, Fire Services Act, local ordinances. Non-negotiable. Dynamically recalculated as project attributes change — not a static lookup.

Dynamic recalculation
R3

Internal Standards

Client and organizational specifications. Indexed in vector DB for query and contradiction detection. Used for compliance checking, not binary BIM verification.

Query & detect
R4

Institutional Know-how

The only generative resource. Experience and lessons from senior staff — structured, tagged, and surfaced as contextual alerts rather than BIM check items. Prevents recurring failures.

Contextual alerts

The Distillation Process

Meeting Minutes
Regulations
Internal Standards
Know-How

Processing Engine

LLM extraction · version control · regulatory recalculation · human approval

Distilled Requirements

Confirmed · Latest · Structured · Sourced → Flows to AI BIM Checker verification

The Distillation Process

1

Four Sources

Meeting Minutes Regulations Internal Standards Know-How
2

Processing Engine

LLM extraction · version control · regulatory recalculation · human approval

3

Distilled Requirements

Confirmed Latest Structured Sourced

The Distillation Process

Meeting MinutesRegulationsInternal StandardsKnow-How

Processing Engine

LLM extraction · version control · regulatory recalculation · human approval

Distilled Requirements

Confirmed · Latest · Structured · Sourced → Flows to AI BIM Checker verification

The Distillation Process

01

Ingest four sources

Meeting minutes · Regulations · Internal standards · Know-how

02

Processing engine

LLM extraction · version control · regulatory recalculation · human approval

03

Distilled requirements

Confirmed · Latest · Structured · Sourced → Flows to AI BIM Checker verification

How it works

Drop in. Approve. The system does the rest.

User effort is limited to two actions. Extraction, classification, version control, and regulatory recalculation are handled automatically.

01 Drop in

MTG-031.pdf

Drop in meeting minutes, regulatory PDFs, standards, or emails. The system extracts requirements automatically.

02 Approve

Review the structured list of new and changed requirements. One action confirms them.

03 Track

v1 · 50㎡ v2 · 88㎡ v3 · 100㎡ ✓

Every version retained with its source meeting and original wording. Query the full history at any point.

01

Drop in

MTG-031.pdf

Hand it the raw material

Meeting minutes, regulatory PDFs, standards, or emails. Requirements are extracted automatically.

Auto · LLM extraction
02

Approve

Confirm in one action

Review the structured list of new and changed requirements. One action confirms them.

Your only decision
03

Track

v1 · 50㎡ v2 · 88㎡ v3 · 100㎡ ✓

Every version, retained

Each version keeps its source meeting and original wording. Query the full history any time.

Auto · version control
01

Drop in

Drop in anything that defines the work.

Meeting minutes, regulatory PDFs, internal standards, emails. The system reads each source and extracts structured requirements — no template, no manual tagging.

Handled automatically: extraction · classification
REQ-072 Examination Room 2 — column spacing REQ-089 Room A — floor area REQ-094 Smoke exhaust · new
02

Approve

Confirm the changes in one pass.

New and changed requirements arrive structured and side-by-side with their previous state. Review, then confirm — the single action that keeps the source of truth current.

Your effort stops here
Room A — floor area88 → 100㎡
Column spacingW2150mm+
Smoke exhaust §126-2new
03

Track

Every state, traceable forever.

Each requirement keeps its full lineage — source meeting, original wording, and every revision. Regulatory implications are recalculated automatically as the design changes.

Handled automatically: version control · recalculation
v1 · 50㎡MTG-001 v2 · 88㎡MTG-015 v3 · 100㎡ ✓MTG-031
Requirements — live workspace
01 Drop in 02 Approve 03 Track

MTG-031.pdf · dropped

Drop in the raw material

The system extracts structured requirements from minutes, PDFs, standards and emails — automatically.

Extracting 24 requirements…
Room A — floor area88 → 100㎡
Column spacingW2150mm+
Smoke exhaust §126-2new

Approve in one action

Review new and changed requirements side-by-side with their prior state, then confirm them all at once.

3 changes ready to confirm
v1 · 50㎡MTG-001 v2 · 88㎡MTG-015 v3 · 100㎡ ✓MTG-031

Track every version

Full lineage is retained — source meeting, original wording, and recalculated regulations for each revision.

Querying history · MTG-001 → 031

What it delivers

Four outcomes grounded in real projects.

The current answer, in one second.

No more filtering Excel or searching emails. Query the confirmed state of any requirement instantly.

Q: Latest area, Room A?
A: 100㎡+. MTG-031 ✓

Memory survives handovers.

Specifications carry who decided, when, and why. Handovers stop being knowledge loss events.

2021 2023 2024 NOW

Juniors won't miss applicable regulations.

Structured list of applicable regulations with conditions for each — before a perspective is ever missed.

15
Definite
18
Conditional
9
Undetermined

Know-how, exactly when needed.

Veteran knowledge surfaces as contextual alerts the moment a relevant requirement is confirmed.

Alert: Adjacent electrical/mechanical rooms — verify vibration control.
01

The current answer, in one second.

No more filtering Excel or searching emails. Query the confirmed state of any requirement instantly.

Q: Latest area, Room A?
A: 100㎡+. MTG-031 ✓
02

Memory survives handovers.

Specifications carry who decided, when, and why. Handovers stop being knowledge loss events.

202120232024NOW
03

Juniors won't miss applicable regulations.

Structured list of applicable regulations with conditions for each — before a perspective is ever missed.

15
Definite
18
Conditional
9
Undetermined
04

Know-how, exactly when needed.

Veteran knowledge surfaces as contextual alerts the moment a relevant requirement is confirmed.

Alert: Adjacent electrical/mechanical rooms — verify vibration control.
01The current answer, in one second. 02Memory survives handovers. 03Juniors won't miss applicable regulations. 04Know-how, exactly when needed.
Q: Latest area, Room A?
A: 100㎡+. MTG-031 ✓

The current answer, in one second.

No more filtering Excel or searching emails. Query the confirmed state of any requirement instantly.

202120232024NOW

Memory survives handovers.

Specifications carry who decided, when, and why. Handovers stop being knowledge loss events.

15
Definite
18
Conditional
9
Undetermined

Juniors won't miss applicable regulations.

Structured list of applicable regulations with conditions for each — before a perspective is ever missed.

Alert: Adjacent electrical/mechanical rooms — verify vibration control.

Know-how, exactly when needed.

Veteran knowledge surfaces as contextual alerts the moment a relevant requirement is confirmed.

Q: Latest area, Room A?
A: 100㎡+. MTG-031 ✓

The current answer, in one second.

No more filtering Excel or searching emails. Query the confirmed state of any requirement instantly.

202120232024NOW

Memory survives handovers.

Specifications carry who decided, when, and why. Handovers stop being knowledge loss events.

15
Definite
18
Conditional
9
Undetermined

Juniors won't miss applicable regulations.

Structured list of applicable regulations with conditions for each — before a perspective is ever missed.

Alert: Adjacent electrical/mechanical rooms — verify vibration control.

Know-how, exactly when needed.

Veteran knowledge surfaces as contextual alerts the moment a relevant requirement is confirmed.

Free Trial

Apply for a free trial.

See Tektome Requirements Management on your own project. Tell us a little about your team and we'll set you up with early access.

  • Capture and track requirements end to end
  • Grounded in your real project data
  • No commitment, no setup required

Apply for free trial