Errors fixed on the drawing, not on site
Design errors are flagged while the package is still in review, with the sheet and the requirement they break.
Measured inRework and remedial costs
For contractors
Every consultant package reviewed against the brief, the regulations and your own standards, with the comments your team keeps writing applied every time.
Book a demoThe problem
Consultant packages arrive with problems your design managers have flagged before. On margins this thin, every error that reaches site comes straight out of profit.
A new team on every job
Each job brings together a different mix of design managers and consultants, so what the last team learned rarely reaches the next one.
Errors found on site, not on the drawing
Whatever the review misses comes back as RFIs, rework and lost days once work has started.
Reviews that depend on who has time
Under programme pressure, packages get a sample review before they are issued or submitted for approval.
Avoidable errors cost an estimated 10 to 25% of project cost. The average pre-tax margin across the UK’s Top 100 construction companies was 2.4%.Source: Get It Right Initiative · The Construction Index Top 100, 2025
With Tektome
Design errors are flagged while the package is still in review, with the sheet and the requirement they break.
Measured inRework and remedial costs
The comments your design managers keep writing become requirements that every consultant package is reviewed against.
Measured inRepeat comments per package
Each package is reviewed against the regulations, the client brief and your standards before it goes for approval.
Measured inResubmissions and approval delays
Value and outcome
Design errors that reach site cost you twice: once to put right, and again in lost time. Catching them on the drawing keeps both under control.
Margin
Less money spent putting design errors right
Rework and remedial work come straight out of your margin. An error fixed on the drawing costs far less than the same error fixed on site.
Programme
Fewer days lost to RFIs and resubmissions
Packages that are right first time mean less waiting on consultants, approvals and revised drawings.
Client confidence
Handovers without the same old defects
Clients see problems from the last project fixed for good, not repeated on the next one.
A 30-minute call about your projects and standards. Nothing to set up, no project data needed.
Then see it on your own work: bring one package and one standard, and we show you what a review would catch.
Step 3 of 3
Thirty minutes, and you will get a calendar invite straight away.
A calendar invite is on its way to your inbox.
Henry will bring a prepared sample project, so there is nothing for you to set up.
Need to change it? Reply to the invite and we will sort it out.