Against the requirements they have to satisfy, before they are accepted rather than on receipt. A submission accepted on arrival transfers the error into fabrication, where it stops being a drawing problem. Where a fabricator has taken a dimension from the model instead of the specification, the submittal is returned with comments before release, not discovered at delivery.
Coordination Validation · UPDATED SEP 10, 2026
How are shop drawings and submittals reviewed against design intent?