The ones that reach site. A specification that says something different from the drawing. A fabricator delivering to the model rather than the intent. A design change that broke a requirement agreed in a meeting four months earlier. None of these intersect anything, and requirements that live in correspondence are invisible to a geometric review, so nothing in the process was looking for them.
Coordination Validation · UPDATED SEP 10, 2026
What kinds of coordination failure does clash detection miss?